Project Overview: A large-scale mine with an annual iron concentrate production of 8 million tons faced three major challenges with its traditional wet screening system: high water consumption (0.8 m³ per ton of ore), winter freeze-induced production shutdowns, and low fine particle recovery rate (only 65%). The mine invested 120 million yuan to upgrade its dry screening system, with the core screening equipment utilizing special crimped wire mesh technology.
Send Us Your Inquiry
If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.
